BLE II bridges, Kuusamo, Lieksa and Savonlinna

BLE II is a reinforced concrete slab bridge for private and forest roads with a clear span of 4-10 metres. In 2022, Kuhmon Betoni, part of the YBT group of companies, supplied the elements for several BLE II bridges designed by VeiTa Tekniikka Oy.

The 2022 projects included the Kuivasjoki bridge in Kuusamo, the Siikajoki bridge in Lieksa and the Paasiniementie bridge in Savonlinna. The bridge elements were manufactured at the Kuhmo factory, where bridge elements meeting the requirements are made routinely. "The bridge in Savonlinna is right next to the Salpa Line and suits its surroundings well in style," said Petri Repola, engineer at VeiTa Tekniikka Oy.

Precast elements speed up bridge assembly and shorten the overall construction time. The BLE II type drawing set was first published in 1982 and updated in line with the Eurocode application guidelines in 2017. The bridge type has a service life of at least 50 years and, as approved by the Finnish Transport Agency, can be used for state-subsidised private roads without separate structural calculations.

Long cooperation

VeiTa Tekniikka tenders, designs and supervises bridge projects for private road associations. By 2022, the company's engineer Veikko Heikkinen had worked with Kuhmon Betoni for almost ten years, and during that time Kuhmon Betoni supplied BLE II bridge elements for about 30 bridges designed by Heikkinen.

"Cooperation with Kuhmon Betoni has gone well. Deliveries arrive at the agreed time and the quality of the elements has been excellent," Repola says.

Project details

Projects: Kuivasjoki bridge, Siikajoki bridge and Paasiniementie bridge

Location: Kuusamo, Lieksa and Savonlinna, Finland

Delivery: 2022

YBT's delivery: elements for BLE II reinforced concrete slab bridges

Scope: several bridges with a clear span of 4-10 m

Factory: Kuhmo (Kuhmon Betoni)