The Helios project at SCA's Östrand pulp mill in Timrå was one of the largest industrial investments in Sweden in the 2010s. In 2016 and 2017 YBT designed, manufactured and erected precast concrete elements for several of the project's buildings, and the package was one of the largest deliveries in YBT's history.
The Helios project raised the mill's capacity from 430,000 to 900,000 tonnes. At the end of 2016 YBT supplied Peab with the elements for the evaporation plant, technical building and MTB building in the new greenfield area. Well over a hundred metres long, 20 metres wide and around 15 metres high, the complex comprised around 700 elements: columns, beams, facade and partition wall elements and floor and roof slabs.
In autumn 2016 SCA also ordered from YBT the frame elements for the chlorine dioxide plant built in the existing brownfield area. The delivery for the building, around 40 metres long, 13 metres wide and 25 metres high, comprised 400 elements, around 3,000 tonnes, and ran from early 2017 until the summer holidays. In spring 2017 Peab also ordered the facades and roof slabs for the cooling tower, the chip handling building and the separation plant. Through Prefabmästarna AB, YBT supplied demanding sandwich elements whitened with titanium dioxide for the new control room building, around 700 m² and 400 tonnes.
The schedule held
In total around 300 truckloads of elements were delivered to the Helios project. Erection was handled by YBT's own erection team led by erection manager Timo Huhtanen, with Krister Jansson as project manager. "The promised schedule has been kept, even though it has been tight from the input data onwards," said Björn Edenroth, project manager at Peab Sverige.
YBT made its first deliveries to SCA in 2006, and over the years it has become a regular supplier to the SCA group. "Well-managed occupational safety and reliability are very important when choosing a partner," said SCA's construction manager Magnus Jinnerot. The Helios project was fully completed in summer 2018.
Project details
Project: SCA Östrand pulp mill, Helios project
Location: Timrå, Sweden
Client: SCA
Main contractor: Peab (greenfield area), Skanska (brownfield area)
Delivery: 2016 to 2017
YBT's delivery: design, manufacture and erection of columns, beams, floor and roof slabs, facade and partition wall elements
Scope: around 300 truckloads; evaporation plant around 700 elements, chlorine dioxide plant 400 elements (around 3,000 t)