Stavro wind power project, Örnsköldsvik

The Stavro wind power project in Örnsköldsvik, Sweden, was YBT's first delivery to wind power construction. The project covered the Blodrotberget and Blackfjället wind farms with a total of 62 wind turbines.

In September 2020 YBT supplied foundation and plinth beams for three transformer stations and the beams beneath them. The delivery also included the elements for two substations.

"All in all, this was an interesting project," says YBT's export sales manager Krister Jansson. From YBT's point of view, wind power projects are interesting both for their environmental benefits and from a construction perspective.

YIT built the wind farm infrastructure

The internal roads, turbine foundations, crane pads and cabling of the wind farms were built by YIT. For the experienced wind power builder, it was the first project of its kind in Sweden. The wind farms were scheduled for completion in summer 2021.

"More wind power will be built in the Örnsköldsvik area, and we want to be involved in those projects too," Jansson says.

Project details

Project: Stavro wind power project, Blodrotberget and Blackfjället wind farms

Location: Örnsköldsvik, Sweden

Main contractor: YIT (wind farm infrastructure)

Delivery: September 2020

YBT's delivery: foundation and plinth beams for three transformer stations, beams beneath the transformer stations and the elements for two substations

Scope: 62 wind turbines in total in the wind farms