The Siilinjärvi plant of fertiliser company Yara extended its laboratory in summer 2018 with precast concrete elements from YBT. The laboratory was part of a wider set of deliveries to Yara's Siilinjärvi plant and mine site in 2017 and 2018.
YBT and Kuhmon Betoni supplied the precast elements for the extension of around 400 square metres in summer 2018. The facade elements were faced with brick tiles, and the extension follows the materials and forms of the old laboratory building. The new part was to be taken into use at the turn of the year, so that work could move there while the older part was renovated, with hardly any need for temporary premises.
"YBT was the only one able to supply the precast elements we needed, and on a fast schedule too," says Ossi Kähkönen, construction manager at Yara's Siilinjärvi plant.
"In an environment like this it has to be built in stone," Kähkönen says.
Other deliveries to the mine site
In 2017 YBT supplied all the elements for a two-storey electrical and transformer building at the mine site. In November 2018 plinth elements were also delivered from Kuhmo for the mine's vehicle wash hall, mainly used for washing off-road vehicles.
The laboratory next to the plant's office building carries out quality control of the end products, among other things. Siilinjärvi is home to the only phosphate mine in the EU and the largest open-pit mine in Finland.
Project details
Project: laboratory extension at Yara's Siilinjärvi plant
Location: Siilinjärvi, Finland
Client: Yara, Siilinjärvi plant
Delivery: 2017 to 2018
YBT's delivery: precast elements and brick-tile-faced facade elements for the laboratory extension; all elements for the electrical and transformer building; plinth elements for the vehicle wash hall
Scope: laboratory extension of around 400 m²
Plant: Kuhmo (Kuhmon Betoni) and YBT